Nebraska Department Of Roads Form
The Nebraska Department of Roads utilizes Form R-123, known as the "Contractor's Statement of Experience, Equipment and Financial Condition," as a critical tool in the prequalification process for contractors wishing to bid on state highway projects. This form, which was last updated in May 2005, is accessible through the Contract Lettings section of the Nebraska Department of Roads’ website. It is essential for contractors to submit their prequalification statements at least ten days before the letting date, ensuring that all necessary documentation is received by the department by 5:00 PM on that deadline. The prequalification process evaluates a contractor's experience, available equipment, and financial stability, which are all vital factors in determining their capability to undertake the work involved in road construction, maintenance, or repair. Notably, the form requires a financial statement certified by a licensed accountant, reinforcing the importance of transparency and accountability in the bidding process. Furthermore, the Nebraska Department of Roads has specific rules governing the advertisement and letting of contracts, which include a minimum bidding period and guidelines for the rejection of bids. These regulations aim to maintain a fair and competitive environment for all bidders, ensuring that contracts are awarded to those who are not only qualified but also capable of delivering quality work. For any inquiries or assistance regarding the form or the bidding process, contractors can reach out to the department directly via phone, fax, or email, fostering an open line of communication between the agency and potential bidders.
Document Preview Example
The Department's Form
PREQUALIFICATION STATEMENTS MUST BE RECEIVED BY THE CONTRACT LETTINGS SECTION OF THE NEBRASKA DEPARTMENT OF ROADS PRIOR TO 5:00 P.M. AT LEAST
TEN (10) DAYS BEFORE THE LETTING IN WHICH THE APPLICANT INTENDS TO SUBMIT BIDS. (See letting schedule posted on the Nebraska Department of Roads’ Contract Lettings
Section Website.)
If you have any questions, please contact us at:
Nebraska Department of Roads
Contract Lettings Section
P.O. Box 94759
Lincoln, NE
Phone: (402)
FAX: (402)
Email: NDOR_Contract_Lettings@dor.state.ne.us
State of Nebraska
Department of Roads
Pertinent Sections of the States Relating to
Letting of Contracts and Prequalifications of Bidders
Section
Section
amount retained and on the final payment due the contractor beginning sixty days after the work under the contract has been completed as evidenced by the completion date established in the department’s letter of tentative acceptance or, when tentative
acceptance has not been issued, beginning sixty days after completion of the work and running until the date when payment is tendered to the contractor.
(2)When the department is required by acts of Congress and rules and regulations made by an agent of the United States in pursuance of such acts to predetermine minimum wages to be paid laborers and mechanics employed on highway construction, the
(3)The department, in its sole discretion may permit a city or county to let state or federally funded contracts for the construction, reconstruction, improvement, maintenance, or repair of state highways, bridges, and their appurtenances located within the jurisdictional boundaries of such city or county, to the lowest responsible bidder prequalified to bid by the department when the work to be let is primarily local in nature and the department determines that it is in the public interest that the contract be let by the city or the county.
Section
Section
Section
Section
Section
STATE OF NEBRASKA
DEPARTMENT OF ROADS
RULES AND REGULATIONS FOR THE QUALIFICATION OF
CONTRACTORS PROPOSING TO BID ON STATE HIGHWAY WORK
(Pursuant to Section
- PREQUALIFICATION OF BIDDERS -
1.All persons, (any individual,
2.The financial showing required in such statement shall be certified by a public accountant holding a currently valid permit from the Nebraska Board of Public Accountancy, or by any certified public accountant holding a currently valid permit.
3.The use of a "Letter of Credit" as an alternate means of showing financial condition will be permitted when the net amount of the "Letter of Credit" does not exceed five hundred thousand dollars ($500,000). The "Letter of Credit" must be from a licensed or chartered financial institution. The "Letter of Credit" shall be certified by a public accountant holding a currently valid permit from the Nebraska Board of Public Accountancy, or by any certified public accountant holding a currently valid permit.
-QUALIFICATION -
1.Each person will be qualified upon such statement for an amount of work which he or she can perform properly as evidenced by his or her financial statement and supplementing documents, and his or her competency and responsibility as evidenced by the amount, condition, and availability of equipment, experience of personnel, and previous record with this and other awarding authorities.
2.Each person will be notified of the "maximum qualification" rating established in his or her case by the department. The “maximum qualification" rating established may be increased or decreased at any time if, as determined by the department, the performance record of the contractor warrants such action. A new statement may be requested at any time if, in the opinion of the department, significant changes in responsibility or financial ability of the person qualified have occurred.
3.Ratings for any one or combination of the following classes of work will be given:
(1) |
Grading |
(8) |
Specialty |
(2) |
Aggregates |
(8a) |
Building Construction |
(3) |
Concrete Pavement |
(8b) |
Electrical |
(4) |
Culverts |
(8c) |
Signing |
(5) |
Landscaping |
(8d) |
Painting |
(6) |
Bridges |
(8e) |
Demolition |
(7) |
Guard Rail and Fence |
(9) |
Bituminous |
|
|
(10) |
General (All Classes) |
Any person who desires a change in the class or classes of work for which he or she is qualified to submit proposals must submit a request in writing for such change, at least ten days before the letting at which he or she desires to bid with the new classification.
- CURRENT RATING -
Each person desiring to bid on work for which prequalification of bidders is required shall submit a request for proposal forms and with such request shall submit, on forms provided by the department, a complete report of all work he or she then has under contract, including subcontracts, and the amount of work not completed on all such contracts. A current qualification based on this statement and the contractor's "maximum qualification" will be established by the department, taking into account the rate of progress which is being made in performing the uncompleted work, the requirements for the performance of the work for which the contractor desires to bid and any other pertinent information that is available to the department. This current qualification shall be the "current rating" which determines the amount of work for which any person is qualified at the particular letting and for which he or she may be awarded a contract or contracts, except that the department may use a tolerance of not more than
- PROPOSAL FORMS -
1.Proposal forms, for which prequalification of bidders is required, will be issued only to those qualified to bid on each contract. A person will not be considered as qualified for any particular letting if his or her qualification rating will expire on or before the date of the letting. Any person submitting two or more bids in a total amount exceeding his or her current qualification by more than
2.Proposal forms, for which prequalification of bidders is required, will be labeled with the name of the bidder to whom they are issued and shall not be transferable. Any proposal which is submitted by a bidder other than the one to whom the proposal form was issued shall be void.
3.Proposal forms for which prequalification of bidders is required, may be issued by the department at its discretion for information only, but such proposal forms shall not be used for bidding and shall be stamped with the words "For information only, not to be used for bidding" and bids submitted on such forms shall be void and not considered.
4.Proposal forms will not be issued to any bidder later than 5:00 o'clock P.M. of the day preceding the letting.
5.A proposal form for any contract, for which prequalification of bidders is required, may be issued at the discretion of the department, to two or more qualified bidders jointly if the classes of work for which the prospective bidders are qualified to perform, satisfy in the aggregate, the qualification requirements for the particular contract. Two or more qualified bidders may not bid jointly to perform any contract, for which prequalification of bidders is required, to be let by the department unless a proposal form is issued by the department to those bidders jointly for that purpose.
Form
State of Nebraska
Department of Roads
Contract Lettings Section
Construction Division
P.O. Box 94759
Lincoln, NE
Contractor’s Statement of Experience,
Equipment and Financial Condition
At the close of business on the |
day of |
|
Fed. I.D. No. |
|
|
For |
|
|
Name |
|
|
Business Address |
|
|
Street |
|
P.O. Box |
City |
State |
Zip Code |
Mailing Address |
|
|
Street |
|
P.O. Box |
City |
State |
Zip Code |
, 20
Corporation
Partnership
Individual
Area Code |
Telephone No. |
Fax No. |
Person to contact regarding this statement:
Name |
Area Code |
Telephone No. |
State of Nebraska Statute
State of Nebraska Statute
INDICATE CLASS OR CLASSES OF WORK
IN WHICH YOU DESIRE TO BE QUALIFIED
(Requesting the major classes of work which include 1, 3, 4, 6, 9 and 10 shown below, without experience in those areas, may decrease the maximum qualification rating which could otherwise be established for your firm.)
(1) Grading
(2) Aggregates
(3) Concrete Pavement
(4) Culverts
(5) Landscaping
(6) Bridges
(7) Guard Rail and Fence
(8) Specialty
(8a) Building Construction
(8b) Electrical
(8c) Signing
(8d) Painting
(8e) Demolition
(9) Bituminous
(10) General (All Classes)
Includes, but may not be limited to, the following items:
Armor Coat, Chip Seal, Fog Seal, Slurry Seal, Microsurfacing, Pavement Repair & Patching, Joint Repair & Patching, Joint Sealing, Crack Sealing, Dowel Bar Retrofit, Diamond Grinding, Rumble Strips, Noise Walls, Paint Striping, Bridge Painting
- 2 -
|
CONTRACTOR’S |
|
|
STATEMENT OF EXPERIENCE, EQUIPMENT |
|
|
AND FINANCIAL CONDITION |
|
|
TABLE OF CONTENTS |
|
|
|
PAGE NO. |
CLASS OF WORK DESIRED FOR QUALIFICATION |
2 |
|
TABLE OF CONTENTS |
3 |
|
INSTRUCTIONS TO ACCOUNTANTS FOR PREPARING FINANCIAL STATEMENTS |
4, 5 |
|
CONTRACTOR’S BALANCE SHEET (Pages |
|
|
Assets |
6 |
|
Liabilities and Capital |
7 |
|
LETTER OF CREDIT (Form |
8 |
|
SUPPORTING SCHEDULES TO BALANCE SHEET (Pages 9 – 13) |
|
|
1. |
Investments |
9 |
2. |
Notes Receivable |
9 |
3. |
Accounts Receivable |
9 |
4. |
Inventories |
10 |
5. |
Prepaid Insurance, Other Prepaid Expenses and Other Assets |
10 |
6. |
Cash Surrender Value of Life Insurance |
10 |
7. |
Property, Plant and Equipment |
10,11 |
8. |
Notes Payable |
12 |
9. |
Accounts Payable |
12 |
10.Accumulated Costs and Gross Income Recognized on Uncompleted Contracts and/or Deferred Credits From
|
Billings and Advance Collections on Uncompleted Contracts |
............................................................................ 12 |
11. |
Individual or Partnership Capital |
13 |
12. |
Capital Stock |
13 |
13. |
Surplus |
13 |
Accountant’s Questionnaire |
14, 15 |
|
Independent Auditor’s Report (Financial Statement) |
16 |
|
Accountant’s Verification Statement (Letter of Credit) |
17 |
|
Contractor’s Questionnaire |
18, 19 |
|
Corporation Information Sheet |
20 |
|
Appointee and Signature Authorization |
21 |
|
Affidavit for Individual |
22 |
|
Affidavit for Partnership |
22 |
|
Affidavit for Corporation |
22 |
|
- 3 -
INSTRUCTIONS TO ACCOUNTANTS FOR PREPARING FINANCIAL STATEMENTS
The accountant preparing contractor's financial statements will adhere to the generally accepted auditing standards as adopted by the American Institute of Certified Public Accountants. Reviews or compilations are not acceptable.
1.Applications for Prequalification will be accepted only on forms furnished by the Department. One copy is
to be submitted to the Nebraska Department of Roads. Reproduced copies of good quality of the
Form
2.The statement shall show the condition of business as determined under generally accepted accounting principles.
3.The date of the report need not necessarily be the contractor's fiscal year; however, the reporting period should be consistent from year to year, except for those contractors reporting on a period basis. The reporting year of a contractor may be a period basis, i.e., 13 periods of 4 weeks each, etc.
4.The name of the person or organization being prequalified must be the proper legal name of the entity and must be shown IDENTICALLY on the Cover of this Statement, in the Letter of Credit, in the Independent Auditor's Report, in the Accountant's Verification Statement and in the Affidavit of the Entity.
The business name used shall be such that full disclosure is assured, i.e., an individual doing business as a trade name shall include the individual's name, DBA, and the trade name. A CORPORATION FILING A
CONSOLIDATED STATEMENT SHALL FULLY DISCLOSE THE IDENTITIES OF SUCH ENTITIES CONSOLIDATED.
5.The Financial Statement Data shall be certified by a Public Accountant holding a currently valid permit from the Nebraska State Board of Public Accountancy, or by any Certified Public Accountant holding a currently valid permit. Whenever the term Certified Public Accountant appears on said form, it shall be construed to include a Public Accountant holding a valid permit from the Nebraska State Board of Public Accountancy. If additional schedules, notes and addenda are attached to Form
REPORT FOUND ON PAGE 16 MUST BE FULLY EXPLAINED BY THE CPA.
6.The Financial Statements SHALL NOT be prepared and certified by an accountant who has directly or indirectly a financial interest in, or is connected with the business of the contractor submitting the statement.
The Contractor's Statement of Experience, Equipment and Financial Condition must be complete in all aspects to be considered as being an acceptable statement. This means all schedules must be completed as required, Detailed Equipment Schedules furnished including all data requested, all signatures are original and not copies or facsimiles, all questions answered and explanations furnished if required, etc. Unacceptable statements will be returned or additional information requested. The last day to accept resubmission of such data by the Contract Lettings Section is by 5:00 p.m., ten (10) days before the letting in which the Contractor desires to bid.
- 4 -
SPECIFIC INSTRUCTIONS - CONTRACTOR'S BALANCE SHEET AND SCHEDULES
(Pages 6 through 13)
(Where there are no instructions for a particular schedule, it is presumed that the schedule itself is self- explanatory.)
CONTRACTOR'S BALANCE SHEET
(Pages 6 and 7)
This statement shall be completed in all aspects. The use of cents is not necessary. Any further rounding of figures must be explained. The classification of Assets and Liabilities between current and
SUPPORTING SCHEDULES
(Pages 9 through 13)
All totals required by the supporting schedules should be shown on the appropriate schedule, even if supplementary additional sheets are used in lieu of the schedule blanks provided in the form.
Where schedules are not complete in themselves, attach supplementary memoranda explaining fully.
INVESTMENTS (Schedule 1) - Where there is no quoted market price of securities of affiliated organizations and investments in partnerships, joint ventures, etc., the investment should be shown at cost, with an indication of the book value of the underlying net assets. Cost of investment should reflect initial cost adjusted for additional investment and subsequent profits, losses and distributions.
NOTES RECEIVABLE (Schedule 2) - All itemizations under (a) and (b) must be complete.
ACCOUNTS RECEIVABLE (Schedule 3) - All itemizations under (a) and (b) must be complete.
INVENTORIES (Schedule 4) - Inventories of similar classification may be grouped. Basis of valuation of inventory must be stated.
PREPAID INSURANCE, OTHER PREPAID EXPENSES, AND OTHER ASSETS (Schedule 5) Self- explanatory.
CASH SURRENDER VALUE OF INSURANCE (Schedule 6) -
PROPERTY, PLANT AND EQUIPMENT (Schedule 7) - Under 7(a) where composite amounts or guideline method of depreciation are used, it would be practically impossible to show the accumulated depreciation by major asset category. Where plant and equipment have been included in group accounts for purposes of computing depreciation, it is suggested that some reasonable allocation be made of the reserve for depreciation of plant, equipment, construction, and other asset categories.
Equipment schedules should be updated for evaluation purpose and include, by classification, all equipment which is still serviceable although fully depreciated.
Under 7(b), land should indicate the carrying amount, that is cost less depletion. Also, under 7(b), items of a like nature can be grouped. Only owned land should be included in the schedule.
Under 7(c), if plant and equipment held under lease or rental contracts are listed in this schedule, the leases should be current as of the statement date, and should not include leases which have been recorded as purchases.
NOTES PAYABLE (Schedule 8) - All itemizations under (a) and (b) must be complete.
ACCOUNTS PAYABLE (Schedule 9) - All itemizations under (a) and (b) must be complete.
ACCUMULATED COSTS AND GROSS INCOME RECOGNIZED ON UNCOMPLETED CONTRACTS AND/OR DEFERRED CREDITS FROM BILLINGS AND ADVANCE COLLECTIONS ON UNCOMPLETED CONTRACTS (Schedule 10) - All explanations under Schedule 10 must be complete.
INDIVIDUAL OR PARTNERSHIP CAPITAL (Schedule 11)
CAPITAL STOCK (Schedule 12)
SURPLUS (Schedule 13)
ACCOUNTANT'S QUESTIONNAIRE
(Pages 14 and 15)
All questions must be answered and explanations furnished if required. - 5 -
File Information
| Fact Name | Description |
|---|---|
| Form Title | The form is officially titled "Contractor's Statement of Experience, Equipment and Financial Condition" and is designated as Form R-123. |
| Submission Deadline | Prequalification statements must be submitted to the Nebraska Department of Roads at least ten days before the intended bid submission deadline, by 5:00 PM. |
| Governing Laws | The form and its requirements are governed by Nebraska Revised Statutes Sections 39-1348 through 39-1354. |
| Contact Information | For inquiries, contact the Nebraska Department of Roads at P.O. Box 94759, Lincoln, NE 68509-4759, or call (402) 479-4525. |
| Confidentiality | All information provided in the prequalification statement is confidential and intended solely for departmental use. |
| Financial Certification | The financial information included in the statement must be certified by a licensed public accountant or a certified public accountant. |
Other PDF Templates
Dhhs Nebraska - Acts as a foundational document for altering marital information in official Nebraska state records.
When considering end-of-life decisions, it is crucial to understand the implications of a Do Not Resuscitate Order. This legal document can significantly influence the care you receive, ensuring your wishes are clear to healthcare providers. For more information, you can visit this guide on the Do Not Resuscitate Order requirements.
Nebraska Sales Tax Form 10 - The Nebraska 10 Form requires details of the preparer, including signature and contact information, to confirm the accuracy of the information provided.
Nys Notary Practice Exam Pdf - Enhance your notary skills with guidelines on ethical practices and the correct application of notarial seals in the State of Nebraska.